Newquay Weather - Solar PV Generation
Sky Cam
SkyCam - North
Power One 3.6 PVI OUTD
Inverter Status - ONLINE
16 August 2026 Sunrise : 06:08 Sunset : 20:40
Max Daylight Hours : 14:27 hours 11 To listen, click
speaker icon top left
Inverter Data : Updated Every 2 Minutes
1 - Week starts Sunday
2 - install date 4/2/2012
3 - Slight difference of 40 W
4 - UK Model (G83)
5 - For other codes see manual
6 - Data entered manually, inverter data
7 - Efficiency, power out / string total %
8 - GMT all year
9 - Alarms Checked 0900,1200,1500,1800
    Reset after check
10 - C02 conversion factor is
     0.542 kg CO2 saved per kWh
11 - Time between sunrise and sunset
12 - Davis VP2 solar sensor
     from 8/2/2018
13 - Immersion heater - Solar pv
Last Update 16-08-2026 11:34 String 1 497 W Grid Voltage 241.9 V
Generation Start Time 16-08-2026 06:22   201 V Av Grid Voltage 243.3 V
Generation Stop Time ---   2.5 A Grid Current 4.1 A
Energy Today inverter data 8.351 kWh String 2 521 W Grid Freq 50.0 Hz
Energy Week 1 8.351 kWh   185 V Peak Power Today 3557 W
Energy Month 332.126 kWh   2.8 A Peak Power Ever 4 3627 W
Energy year 2 3259.619 kWh Total 1018 W Internal Temp 48.0 C
Energy lifeTime 3 62410.452 kWh Power Out 982 W Isolation Resistance 20.00 MΩ
Min Day Energy 6 10/12/2016 - 27 W Efficiency 7 96.46 % Dc/Dc Current Leak 0 mA
Max Day Energy 6 8/6/2015 - 28.9 kW     Inverter Current Leak 0 mA
Solar Radiation 12 16-8-2026 11:35 234 W/m2   Inverter Time 8 11:33 BST
Immersion Heater 13 [125] 16-08-2026 11:22 OFF     CO2 Saved Year10 1767 kg
Alarm Code 5 No Alarm     CO2 LifeTime10 33826 kg
Last 4 Alarms Codes 9 Last check 0900 15 15 15 15
Last Alarm Code 13-08-2026 17:16, 202 Code: 202
Note : Whilst inverter self testing it may return false data
Full solar pv page including graphs